A significant portion of Tundra’s expertise has been in compression. Many of our Project Engineers are considered rotating equipment experts as well as competent designers and builders of these facilities.
Duvernay Oil Corp.
Medicine Lodge
Grassroots facility for compression with dehydration, including 2,237 kw (3,000 HP) of compression.
Apache Canada Corp.
Lonepine/Torrrington
Design and Project Management of the installation of grassroots compressor station totaling 5,518 kw (7,400 HP) with two inlet trains and refrigeration plant. Design required significant noise abatement measures.
Apache Canada Corp.
Golden Prairie (Saskatchewan)
Design and Project Management of the installation of grassroots compressor station totaling 3,281 kw (4,400 HP) with two dehydration trains.
Duvernay Oil Corp.
Wroe Area
Design and Project Management of the installation of grassroots compressor / dehydrator station and two subsequent expansions for a total of 4,474 kw (6,000 HP) installed.
Highlights:
Encana Corp.
Bissette Infrastructure
-Design and project management to increase the field capacity by 3115 x 103 m3/d (110 MMscfd) by installing pipelines (6" to12") and compressor stations (gathering and pipeline).
A total of 21,000 HP added to date.
Duvernay Oil Corp.
Edson Compressor Station
-Critical Sour (15% H2S)
-Inlet filtration and conditioning
-Glycol Dehydration to 2lbs/MMscfd
-Vapour recovery on dehydrator regenerator to eliminate flaring and incineration